The mechanical and plumbing sub-contractors have been working on the rough-ins. It’s amazing how much abuse the studs and floor joists can take with all the holes and drilling -- and still perform!
We have specified a number of interior chases (exterior SIPs walls don’t really work for this) which are quickly filling up.